Thurles Leisure Centre Biomass Boiler


Biomass BoilerThurles Leisure Centre (run on behalf of Thurles Town Council) Installed the 500 kW Biomass Boiler in 2011/12. The Town council, aided by Tipperary Energy Agency procured the boiler on a D.B.O type contract in 2011 and the system was handed over in February 2012.

Some Key facts:

  • The pool will save approx. €68,000 per year in energy costs.
  • This equates to 44 extra visitors per day paying €5 per visit.
  • The CO2 equivalent saving is that of 160 cars removed off the road.

Summary
Heat load in kWh – 1,500,000
Biomass cost – €47,000
Equivalent LPG cost @ – 55c/litre €115,000
Saving – €68,000
Capital Cost – €160,000
DoTTS Grant – €136,000
CO2 Saving in Tonnes – 400.00

biomass-boilerTipperary Energy Agency’s role was:

  • Feasibility Study
  • Procurement
  • Funding application
  • Project Management

With DoTTS Grant Aid
Simple Payback in Months 6
10 Yr NPV €496,000
10 Yr IRR 194%

Without Grant Aid
Simple Payback in Months 30
10 Yr NPV €377,035
10 Yr IRR 59%

Key Innovation: Contracts

  • Design Build Operate Contract
  • Contractor pays for all oil, maintenance, chip etc.
  • Single heat supply contract fixed at 3.8c/kWh for 5 years
  • All losses, breakdowns covered by contractor
  • Chip supplied locally.